 |
Project Name |
 |
Location |
 |
Period |
 |
|
Officer Residence of the U.S. Forces in Sungnam K-16 |
|
K-16 Air Force Base |
|
2005.11.02 ~ 2007.07.01 |
|
|
|
Repair/replace interior mechanical system, Bldg. S-3404 at Camp Eagle |
|
United States 8th Army, Whengsung-Gun,Gangwon-Do |
|
2004.11 ~ 2005.02 |
|
|
|
Replace interior nad HVAC system, Bldg. S-3401 7 3402 atCamp Eagle |
|
United States 8th Army, Whengsung-Gun, Gangwon-Do |
|
2004.11 ~ 2005.02 |
|
|
|
Repair/replace mechanical and electrical system, Bldg. S-3104 & S-3106 at Camp Eagle |
|
United States 8th Army, Whengsung-Gun, Gangwon-Do |
|
2004.11 ~ 2005.01 |
|
|
|
Repair/replace interior mechanical system, Bldg.S-3108 at Camp Eagle |
|
United States 8th Army, Whengsung-Gun, Gangwon-Do |
|
2004.11 ~ 2005.02 |
|
|
|
Construct Tactical Site Area and Renovate Buildings 241, 243 and 2106 at KwangJu |
|
Air division of KwangJu, Jeollanam-Do |
|
2004.08.17 ~ 2004.10.24 |
|
|
|
Upgrade (including new construction work) USFK Facilities Located in the Republic of Korea. |
|
All over Korea |
|
2004.07.05 ~ 2009.07.04 |
|
|
|
Replace Windows at Bldg #251&252, OSAN AB |
|
Osan City, Gyeonggi-Do, Osan AirBase |
|
2004.06.14 ~ 2004.07.31 |
|
|
|
Repair, Ugrade and Turnover Maintenance Services for Family Housing at Yongsan and Hannam Village |
|
674 Yongsan-Dong Yongsan-Gu, Seoul, United States 8th Army |
|
2004.04.01 ~ 2009.03.31 |
|
|
|
Painting of Exterior Embassy Housing Seoul |
|
674 Yongsan-Dong Yongsan-Gu, Seoul,United States 8th Army |
|
2003.12.01 ~ 2004.07.31 |
|
|