|
|
2007.03.19 Contracted the first domestic BTL project of Injae Univ. Paik Hospital in Haewoondae 2007.06.20 Received the 2007' Award for Environment-Friendly Management 2007.09.06 Completed the first BTL project by U.S. government |
| |
|
|
2006.02.18 Completed Spa Greenland 2006.02.20 Completed Jiphyunkawn of Sejong University 2006.02.23 The 2006¡¯s Cooperation of Employers with Companies Awards 2006.03.16 Selected as a ¡°Quality Builder¡± by the Korea Rail Network Authority 2006.05.02 Obtained soil purification work license (No.2006-06) 2006.05.03 Completed Seosan Jungang Hospital 2006.05.07 Completed Daelim Methodist Church 2006.05.08 Completed World Gloria Center of Myung Sung Church 2006.05.25 Concluded an agreement for Physical Education Theme Park in Water Distribution Reservoir of Gangnam Daechi 2006.09.12 Completed Complex Playground in Korea University's Seochang Campus 2006.10.26 Awarded a Bronze Prize in ¡®the 11th Construction Culture awards of Kyungkido 2006.11.10 Received a Grand Prize of 2006¡¯ Social Contribution Corporation Awards |
| |
|
|
2005.03.02 Completed Memorial Hall for WoonJae Moo 2005.03.21 Selected as a ¡°Quality Builder¡± by the Korea National Housing Corporation 2005.05.04 Completed Korean Metal Cans Exhibition Hall 2005.05.11 Completed Andong Seong-so Hospital 2005.10.13 Selected as a ¡°Special Enterprise on Environmentally- Friendly Construction Industry¡± by the Korea Times 2005.10.22 Completed Sae Eden Church 2005.12.28 Contract with Dongdaemoon District Office for Social Overhead Capital Business |
| |
|
|
2004.01.07 Renewal of certificate of business registration in housing construction (construction on a site)(13BO11300139) 2004.02.05 Completed LFG power station in CheongJu City 2004.02.28 Completed International Hall of Kimpo College 2004.07.16 Credit rating A- by Korea Construction Financial Cooperative 2004.09.21 Completion of Memorial hall for Soyang, Ki Chul Joo in Presbyterian College and Theological Seminary 2004.11.05 Completed Service reservoir of Maegok Filtration plant in Daegu 2004.12.30 Acquired qualifications as Active Contractor for projects by Department of the Army, FED Corps of Engineering |
| |
|
|
2003.03.03 (Official commendation from the National Tax Administration Office on the ¡°37th Taxpayers Day¡± commemoration 2003.03.21 Company name changed to Seohee Construction Ltd. 2003.04.10 Completed LFG Power plant in Jeju 2003.04.25 Completed expansion of LFG Power plant in Busan 2003.06.01 Acquired credit rating of A+ from Korean Housing Guarantee Co. 2003.06.12 Contracted of maintenance service for civil facilities in Incheon International Airport 2003.12.11 Completed LFG Power plant in Gwangju 2003.12.26 Moved main office to: 4-4 Soonae-Dong, Bundang- Gu,Seongnam City, Gyeonggi-Do
|
| |
|
|
2002.01.01 Registration of Military Purveyance Security Examination 2002.02.19 Selected as a ¡°Quality Builder¡± by the Korea National Housing Corporation 2002.03.19 Selected as a ¡°preferred negotiator¡± for a privately invested food waste treatment/power generation project by the city of Busan. 2002.05.16 Won the third prize at ¡®2002 Seoul Architectural Work Awards 2002.05.30 Completed the LFG power station in Ho-Dong, Pohang City 2002.06.30 Acquired credit rating of AA from Korea Construction Financial Cooperative
|
| |
|
|
2001.02.08 Entered into an agreement with EDL KOREA on developing electricity by reclaimed gas in Busan 2001.03 Credit rating A- by Korea Construction Financial Cooperative 2001.05.26 Obtained business license for landscaping 2001.06.25 In Belgium, entered into a technological agreement introducing the DRANCO Process related to food waste treatment/energy development 2001.07.02 Obtained ISO 9002 Certification 2001.11.27 Entered into an agreement with Belgium on introduction of DRANCO Process technology to develop energy through food waste treatment 2001.12.31 Acquired credit rating of AA from Korea Construction Financial Cooperative
|
| |
|
|
2000.03.04 Moved the main office to: 312 Sampyoung- Dong, Bun dang-Gu, Seongnam City, Gyeonggi-Do 2000.03.21 Changed company name to Seohee E&C Ltd. 2000.04.04 Obtained a business license for gas facility construction (Type 1) 2000.07.14 Exchanged Memorandum of Understanding with EDL GROUP OPERATIONS PTY LTD.
|
| |
|
|
1999.01.06 Obtained a business license for soil treatment facility design and construction (No. 19)1999.03.24 Applied for a business license as an overseas construction business 1999.08.13 Obtained a construction business license for facility maintenance and management 1999.12.12 Listed on KOSDAQ stock market |
| |
|
|
1998.01.15 Obtained a business license for soil treatment facility design and construction (No. 2478) 1998.12.12 Obtained a business license for construction of water treatment facilities (No. 595) |
| |
|
|
1997.03.05 Contracted with Incheon International Airport for Construction of P.C water pipe 1997.05 Established a corporation in Guinea, Africa 1997.12.29 Fire Protection Engineering Works
|
| |
|
|
1996.04.17 Registered as a waste treatment facility design and construction business (No. 176) |
| |
|
|
1995.01.01 Signed a contract for civil engineering and construction services with POSCO (formerly Pohang Iron & Steel) 1995.11.01 Received the Safety Award from the Korean Occupational Safety and Health Agency for achieving 500,000 man-hours of accident-free operation 1995.12.20 Obtained electrical work license (Type 1 No. 95) |
| |
|
|
1994.09.16 Established Seohee Construction Ltd. 1994.12.10 Obtained construction business license (Civil Engineering No. 179, Construction No. 823) 1994.12.12 Registered as housing construction business (no.94-23-65)Opened Pohang Office |
| |